CENECO SETS POWER INTERRUPTION ON JUNE 28

Central Negros Electric Cooperative, Inc. informs its consumers connected to Sum-ag Feeders 1 and 2 (SF1 and SF2) that maintenance activities will be conducted on June 28, Sunday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follow:

 

Date: June 28, 2020 – Sunday
Reasons:

• Degassify the 10MVA power transformer and repair of damaged buchholz relay flange coupling; regasketing/repair of primary and secondary bushing and terminals of 10MVA at Sum-ag Substation, crossing Abuanan Road, Brgy. Sum-ag, Bacolod City; and

• Line clearing of SF1 and SF2

 

Time: 6am to 6pm

Areas Affected: SF1 From Sum-ag Substation to Sum-ag Highway, whole of Pta. Taytay Road including VMA, Sum–ag Highway to Medalla Elementary School near CEGASCO, Brgy. Pahanocoy, Pahanocoy Village (NHA Housing), Brgy. Road from BanggaTomaro to Brgy. Cabug and along Circumferential Road from Araneta down to HJR Prawn Processing, Boundary of Bago City and Bacolod City including Fiesta Homes Subd., Prk. KBS and San Sebastian Village up to Pta. Taytay Elementary School, Brgy. Firmville executive, Villa Maria Reyna South, BanggaTotong, Had. Edmar, Handumanan, Brgy. Felisa, Prk. Maasin&Prk. Sta. Rita, Dulao, Prk. Tumpok&Prk. Overflow, Blumentritt.

 

SF2 From Sum-ag Substation along Abuanan Road (Sum-ag) to portion of Bago, Brgy. Tabunan, Sta. Clara subd. Quete Place resort, Brgy. Dulao, Maria Elena , Quiet Place Resort, Brgy. Atipulu-an and Brgy. Abuanan, Sayson Piggery, GC&C Crusher, Prk. Sambag, Prk. Cadena de Amor, Prk. Rose 1 & 2.

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.

 

(SGD.) ENGR. JOSE M. TANIONGON
OIC – Office of the General Manager