CENECO
POWER ADVISORY
Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on August 1 (Saturday) and 3 (Monday). This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of these outages are as follows:
Date: August 1, 2020 – Saturday
Reasons:
• Line maintenance and replacement of damaged insulators; and
• Line clearing activity
Time: 6am to 2pm
Areas Affected: TF3 (portion only) Brgy. Dos Hermanas and Brgy. Katilingban
Date: August 3, 2020 – Monday
Reasons:
• Conversion of two cross arm assemblies to alley arm assembly, from C1 to C15 at Hervias Road 3, Brgy. Villamonte, Bacolod City;
• Conversion of two C1 to two C14 to avoid traversing of private property at Alpha St., Greensville 1, Brgy. Villamonte, Bacolod City
Time: 8:30am to 11am
Areas Affected: AGF4 (portion only) Hervias 1st road, 2nd road, portion of 6th St., Luis Hervias National High School and Las Villas De Hervias, Brgy. Villamonte, Bacolod City
Time: 1:30pm to 3:330pm
Areas Affected: BF2 (portion only) portion of Alpha, Gamma, Delta and Epsilon streets, Greensville 1 and The Palisades Subd., Brgy. Villamonte, Bacolod City
Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.
Sorry for the inconvenience.
(SGD.) ENGR. JOSE M. TANIONGON
OIC – Office of the General Manager