CENECO SETS POWER INTERRUPTION ON JANUARY 6

Central Negros Electric Cooperative, Inc. informs its consumers connected to Asdes-Gonzaga Feeder 4 (AGF4) that maintenance activities will be conducted on January 6, Wednesday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

Central Negros Electric Cooperative, Inc. informs its consumers connected to Asdes-Gonzaga Feeder 4 (AGF4) that maintenance activities will be conducted on January 6, Wednesday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

 

Date: January 6, 2021 – Wednesday


Reasons:
• Erection of one 40ft. concrete pole at Lot Boundary, installation of primary assembly, relocation of three 25kVA private distribution transformer together with its accessories, transfer of secondary assembly and removal of rotten pole to avoid illegal tapping of consumers and safety of life and property.

 

Time: 6am to 12nn

 

Areas Affected: Asdes Gonzaga Feeder 4 (portion only)
Galo Street from Lopez Jaena St., to Mabini St., Portion of Hilado St., BBB St., Portion of Brgy. 19, Brgy. 20, Brgy. 22 and Brgy. 23, Bacolod City

 


Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.

 

(Sgd.) ATTY. DANNY L. PONDEVILLA
Project Supervisor/Acting General Manager