CENECO POWER ADVISORY POSSIBLE LOAD DROP ALLOCATION

Date: July 8, 2021 – Thursday

 

Reason: Overloading of NGCP Amlan-Samboan 138kV Line 2 (Cebu-Negros Submarine Cable), and due to APMS of PCPC.

 

Time:
1900H- 10.1 MW
2000H- 5 MW
2100H- 4.1 MW

 

Possible feeders affected of the load dropping today July 8:

(In between 7pm – 9pm)
Lopez Feeder 3 – 1.75MW
Alijis Feeder 3 – 6.4MW
Talisay Feeder 3 – 4MW
Hilangban Feeder 4 – 2.2MW
Alijis Feeder 1 – 3.5MW
Burgos Feeder 2 – 2.2MW
Reclamation Feeder 3 – 1.5MW

 

Sorry for the inconvenience.

Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@