CENECO
POWER ADVISORY
Slider

CENECO SETS POWER INTERRUPTION ON SEPTEMBER 22

CENECO SETS POWER INTERRUPTION ON SEPTEMBER 22

Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on September 22, Wednesday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

 

Date: September 22, 2021 – Wednesday

 

Reasons:
• Replacement of five 30ft. rotten open secondary poles with five 30ft. concrete poles for safety; and
• Tree clearing activities.

 

Time: 9am to 3pm

 

Areas Affected: BF1 (portion only) Maple St., including portion of Mulberry St., Villa Angela Subd., Brgy. Villamonte, Bacolod City

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons.

 

When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.

 

(SGD.) ATTY. DANNY L.
PONDEVILLA PS / Acting General Manager

Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@