CENECO
POWER ADVISORY
Slider

CENECO SETS POWER INTERRUPTION ON MARCH 5

CENECO SETS POWER INTERRUPTION ON MARCH 5

Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on March 5, Saturday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:


Date: March 5, 2022 – Saturday

 

Reasons:
• Erection of one 35ft. concrete pole to replace the leaning broken telco pole;
• Conversion of C1 and C2 assemblies to alley-arm to offset the 3-phase primary line encroaching a private property.

 

Time: 8am to 12nn

 

Areas Affected: AGF5 (portion only) Milky Way St., Fuentebella Subd.

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.

 

(SGD.) ENGR. JOSE M. TANIONGON
OIC – Office of the General Manager

CENECO SETS POWER INTERRUPTION ON MARCH 5
Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@