CENECO Advisory: Emergency Power Interruption - April 17, 2022 (CF2)

CENECO Advisory: Emergency Power Interruption - April 17, 2022 (CF2)

Date: 4/17/2022


Areas Affected: CF2, Calumangan Sub Station to Brgy. Taloc, Bago City


Time Offline: 5:14AM
Time online: 12:54 PM


Reason: Busted -1-25 KVA distribution transformer CSP type that is connected to the trunkline of the CF-2 Feeder located at Crossing Aqui, Calumangan.


Sorry for the inconvenience.

Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@