CENECO SETS POWER INTERRUPTION ON DECEMBER 5
Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on December 5, Saturday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:
Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on December 5, Saturday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:
Date: December 5, 2020 – Saturday
Reasons:
• Replacement of one 30 ft. rotten pole by one 40ft. concrete pole;
• Transfer of primary and secondary lines to the newly-erected pole and installation of three 37.5 kVa distribution transformer with its accessories.
Time: 9am to 4pm
Areas Affected: HF2 portion of Gen. Luna St. from 7 Eleven to SSS area (7 Eleven Store, Maybank, Bago City Coliseum, Bago City Hall, SSS Office)
Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons.
When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.
Sorry for the inconvenience.
(SGD.) MARIA AGNES L. CLARO
OIC – Office of the General Manager