CENECO
POWER ADVISORY
Slider

CENECO SETS POWER INTERRUPTION ON JULY 25

Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on July 25, Saturday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

 

Date: July 25, 2020 – Saturday
Reasons:


• Massive replacement of damaged pin insulators and installation of insulated pipes to line hardware on selected areas from Hda. Wawa, Murcia to Salvador Benedicto; and
• Tree trimming.

 

Time: 6am to 12nn

 

Areas Affected: Murcia Feeder 2 (MuF2) portion of Murcia (Balasyang and Pandanon Silos), whole municipality of Salvador Benedicto

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.


(SGD.) ENGR. JOSE M. TANIONGON
OIC – Office of the General Manager

ADVISORY

Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@