Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on March 30, Saturday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:
Date: March 30, 2024 – Saturday
Time: 6am to 9am
Reasons: •Midspan erection of one 40ft. concrete pole installation of primary line accessories and assemblies; and •Installation of three 75kVa private distribution transformer together with its accessories and primary metering.
Areas Affected: Burgos Feeder 2 (MF2) (portion only) Upper East Megaworld Corporation: One Manhattan temporary facility area and Herald Park temporary facility area.
Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102 and 1103 or at mobile numbers 0949-401-0144 and 0967-471-5122.
Sorry for the inconvenience.
(SGD.) ATTY. ARNEL L. LAPORE Acting General Manager