CENECO
POWER ADVISORY
Slider

CENECO SETS POWER INTERRUPTION ON MAY 27

CENECO SETS POWER INTERRUPTION ON MAY 27

Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on May 27, Friday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

 

Date: May 27, 2022 – Friday

 

Reasons:
• Installation of 73kV post insulators; and
• Tree clearing activities.

 

Time: 6am to 8am

 

Areas Affected: Bacolod-Reclamation 69kV Transmission Line

RF1 Prk. Boulevard, San Juan St. (from San Sebastian to Gonzaga St.), Sylvia Manor, portion of City Hall facing Luzuriaga, Plaza Mart, San Juan St. (Burgos St. along Cordova Boulevard Road–North Drive), South Capitol Road (San Juan St.–Lagoon), BREDCO, Reclamation Area, along San Juan St. (B.S. Aquino Drive – Burgos St.), Gatuslao Imperial Court going to North Drive, Caltex North Drive going to Puregold. Cordova St., Puregold Banago going to Bangga Langis


RF2 Lopue’s San Sebastian, San Sebastian St. (from San Juan to Gatuslao St.), Araneta St. (Rodriguez Avenue–Gonzaga St.) Gaisano Dept. Store, part of Bacolod City Hall facing Araneta St. near Terry’s, Ballesteros St. NOHS, LCC HRM School


RF3 Araneta St. (Rodriguez Ave.-Magsaysay), Grand Regal Hotel, Visayan Daily Star, DYRL, Rosario St. (Yulo to San Juan), Yulo’s Park, San Juan Street (Rosario St. to San Sebastian), ETCS, Slaughter House


RF4 SM City Bacolod (South Wing)


RF5 SM City Bacolod (North Wing)


Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102 and 1103.

 

Sorry for the inconvenience.

 

(SGD.) ERVIN STAN LEO P. TICAR
Acting General Manager

CENECO SETS POWER INTERRUPTION ON MAY 27
Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@