CENECO
POWER ADVISORY
Slider

POWER INTERRUPTION SET ON OCTOBER 15

POWER INTERRUPTION SET ON OCTOBER 15

Central Negros Electric Cooperative, Inc. informs its consumers that a scheduled power interruption is set on October 15, Saturday. This is to cater Unity Digital Infrastructure’s tapping of their primary line. Details of this outage are as follows:

 

Date: October 15, 2022 – Saturday

 

Reasons:
• Unity Digital Infrastructure will conduct tapping of their primary line for their sites located at Brgy. Ma-ao Proper, Brgy. Busay, and Prk. Riverside, Brgy. Tabunan, Bago City

 

Time: 9am to 10am

 

Areas Affected: Hilangban Feeder (HF) 4 (portion only) Prk. Masulhay, Brgy. Ma-ao (along Rizal Street), Bago City

 

HF1 (portion only) Prk. San Francisco and portion of Prk. Camingawan, Brgy. Busay, Bago City

 

Time: 11am to 12nn

 

Areas Affected: Sum-ag Feeder (SF) 2 (portion only) Prk. Riverside and Brgy. Tabunan Proper, Bago City

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102 and 1103.

 

Sorry for the inconvenience.

 

(SGD.) ERVIN STAN LEO P. TICAR
Acting General Manager

Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@