CENECO SETS POWER INTERRUPTION ON OCTOBER 17 (AF3 portion only)

Central Negros Electric Cooperative, Inc. informs its consumers connected to Alijis Feeder 3 that maintenance activities will be conducted on October 17, Saturday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

Central Negros Electric Cooperative, Inc. informs its consumers connected to Alijis Feeder 3 (AF3) that maintenance activities will be conducted on October 17, Saturday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

 

Date: October 17, 2020 – Saturday

 

Time: 6am to 8am

 

Reasons:

 

• Midspan erection of 1-45ft. concrete pole and installation of 3-75kVA private distribution transformers on pedestal together with its accessories.

 

Areas Affected:

 

ALIJIS FEEDER 3 (AF3) (portion only)

 


Circumferential road from Negros Metal/Crossing Circumferential Alijis-Murcia Road to Oroland including La Villa De Guadalope Subd., MBL Subd., Pedrosa Subd., Bacolod Homes Royal Subd., and Mt. Carmel Village, Brgy. Alijis and Camella South Subd., Brgy. Tangub, Bacolod City

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.

 

(SGD.) MARIA AGNES L. CLARO, MBA
OIC – Office of the General Manager