CENECO
POWER ADVISORY
Slider

CENECO SETS POWER INTERRUPTION ON SEPTEMBER 24

Central Negros Electric Cooperative, Inc. informs its consumers that maintenance activities will be conducted on September 24, Friday. This is to ensure stability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follows:

 

Date: September 24, 2021 – Friday

 

Reasons:
• Extension of 3-span, 1-phase primary line, erection of two 35ft. steel poles, installation of its primary and secondary assemblies, removal of 1-span, 1-phase primary line and underbuild secondary line traversing a private property; and
• Tree clearing activities.
Time: 9am to 2pm

 

Areas Affected: MF4 (portion only) Prk. Pinetree, Eslit Realty and Dev’t. Corp., portion of Circumferential road near Eslit, Brgy. Bata, Bacolod City

 

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.

 

Sorry for the inconvenience.

(SGD.) ATTY. DANNY L. PONDEVILLA
PS / Acting General Manager

CENECO SETS POWER INTERRUPTION ON SEPTEMBER 24
Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@