CENECO
POWER ADVISORY
Slider

CENECO Power Advisory: Unscheduled Power Interruption: January 2, 2024

CENECO Power Advisory: Unscheduled Power Interruption: January 2, 2024

Voltage fluctuations are experienced in all CENECO coverage areas.

Rest assured, our technical team is closely coordinating with the National Grid Corporation of the Philippines (NGCP) to identify the root cause of the voltage fluctuations.

Date: January 2, 2024 – Tuesday

Time offline: 2:20pm; 2:26pm

Affected Areas: Bacolod, Bago, Murcia, Don Salvador Benedicto, Talisay, Silay

Thank you for your usual understanding.

[UPDATE as of 9:30pm] Hilangban Feeder 1 still remains with no power.
Status: Troubleshooting is ongoing.

Rest assured that our technical team is doing their best to restore the power in the affected feeder.

**********
[UPDATE] As of 8:34pm, Hilangban Feeder 4 is online.
**********


[UPDATE] Emergency Power Interruption


Date: January 2, 2024- Tuesday


Affected Areas:


HF1- Test Energized
Affected Areas: Portion of Brgy. Lag-asan, Brgy. Balingasag, Bago City College, Prk. Kapahuan 1 & 2, Bago City Hospital, , Prk.


Santan, San Esteban Phase 2, Sta. Catalina Subdivision, Brgy. Sampinit, CF1, CF2, San Gabriel Subd., Villa Cristita, Carmella Homes, Prk. Camingawan, Prk. San Francisco, BrgyCalumanggan, Prk. Flower, Prk. Paraiso, Brgy. Taloc, Prk, Newton, Cawayanan, Brgy. Busay, Brgy. Taloc


HF4- Automatically Tripped Off


Time Offline: 6:04 PM


Affected Areas: Lag-asan Relocation Site, Brgy. Napoles, Brgy.


Malingin, Crossing Mining, portion of Brgy. Atipuluan, Brgy.
Ma-ao, Villa Crestita, Brgy. Bacong, Brgy. Binubuhan, Brgy.
Mailum, Brgy. Ilijan, Viva Mineral Water, Buenos Aires Resort, Brgy. Manghumay, PNOC-EDC


All tripped feeders waiting for NGCP clearance to re energize.
_____________________________________________
[UPDATE] HF1 is not yet energized. Survey is still ongoing.
____________________________________________
Affected areas: Portion of Brgy. Lag-asan, Brgy. Balingasag, Bago City College, Prk. Kapahuan 1 & 2, Bago City Hospital, , Prk.
Santan, San Esteban Phase 2, Sta. Catalina Subdivision, Brgy. Sampinit, CF1, CF2, San Gabriel Subd., Villa Cristita, Carmella Homes, Prk. Camingawan, Prk. San Francisco, BrgyCalumanggan, Prk. Flower, Prk. Paraiso, Brgy. Taloc, Prk, Newton, Cawayanan, Brgy. Busay, Brgy. Taloc


[Update] CENECO Power Advisory: Unscheduled Power Interruption as of 4:20PM HF1, HF3 and HF4 is now online.


HF1 is still offline
Date: January 2, 2024 – Tuesday


Time offline: 3:12pm
Estimated time: 2 hours


Reason: Replacement of damaged disconnect switch
Affected Areas: HF1 Portion of Brgy Lag-asan, Brgy. Balingasag, Bago City College, Prk. Kapahuan 1 & 2, Bago City Hospital, Prk. Santan, San Esteban Phase 2, Sta. Catalina Subdivision, Brgy. Sampinit, CF1, CF2, San Gabriel Subd., Villa Cristita, Carmella Homes, Prk. Camingawan, Prk. San Francisco, BrgyCalumanggan, Prk. Flower, Prk. Paraiso, Brgy. Taloc, Prk, Newton, Cawayanan, Brgy. Busay, Brgy. Taloc


HF2 The whole area of Bago City including San Esteban Phase 1, Brgy. Poblacion, Pta. Playa, Prk. Batad, Prk. Malipayon, Baywalk, Brgy. Sampinit Proper
HF3 Crossing Ubay, Bago Eco-Center, Humberto’s Resort, Hda. Pili, Brgy. Pacol, Brgy. Bagroy, Brgy. Sagasa, Brgy. Caridad, Brgy. Allanza, Brgy. Don Jorge Araneta (Central Ma-ao).


HF4 Lag-asan Relocation Site, Brgy. Napoles, Brgy. Malingin, Crossing Mining, portion of Brgy. Atipuluan, Brgy. Ma-ao, Villa Crestita, Brgy. Bacong, Brgy. Binubuhan, Brgy. Mailum, Brgy. Ilijan, Viva Mineral Water, Buenos Aires Resort, Brgy. Manghumay, PNOC-EDC


Sorry for the inconvenience.

[UPDATE as of 4:55pm]

Initially PEDC unit 1 tripped at 1206H noon due to boiler feed pump issue. At 1409H, both PEDC unit 2 and PCPC tripped.

PEDC unit 3 is on planned outage since mid December.
At 1307H, Panay is isolated.

Power restoration is ongoing.

[UPDATE] Total tripping of Negros-Panay grid at 3:07pm.

CENECO is still awaiting update from NGCP.

**********

CENECO Power Advisory: Unscheduled Power Interruption

Scroll to Top
� �  �� ����� ���  �� �H��������P����������� ���������P��� �������P������������H�@