CENECO
POWER ADVISORY
Slider

NGCP SETS POWER INTERRUPTION ON JANUARY 28

NGCP SETS POWER INTERRUPTION ON JANUARY 28

The National Grid Corporation of the Philippines (NGCP) will shut down its Bacolod-San Enrique 69kV transmission line (TL) affecting CENECO’s Sum-ag and Hilangban substations, on January 28, Sunday.

CENECO shall take advantage of this downtime by implementing simultaneous maintenance works.
Details of this outage are as follows:

Date: January 28, 2024 – Sunday

Time: 6am to 6pm

Reasons:
•NGCP will conduct
1.Replacement of wood poles along Bacolod – San Enrique TL;
•CENECO’s Ride-on Activities:

1. Preventive maintenance of 10MVA Sum-ag Substation and 10MVA Hilangban substation;

2. Replacement of primary rotten poles for safety and reliability of distribution line; and

3. Tree clearing activities.
Areas Affected: Bacolod-San Enrique 69kV TL
Sum-ag Substation

SF1 From Sum-ag Substation to Sum-ag Highway, including Villa Maria Subd. Sum –ag High school, Prk. Brotherhood, San Luis Village. Whole of Pta. Taytay Road including VMA. Fiesta Homes, South Side, Bagong Pag-asa, Sum–ag Highway to Medalla Elementary School including Sum-ag Elem sch., Prk. Santan, Prk. Providence, South Homes, Prk. Mbinuligon, San Jose 1 & 2, Prk Kasanag, Gk Housing, Had Badyang, Brgy. Pahanocoy, from bangga Tomaro going to Brgy Cabug including Prk Rc, Firmville Executive, Sp Village, Guillena Subd., Valley Homes subd. Deca Homes GK Village, Prk. Malipayon. Cegasco Going to Handumanan including NHA, Acasia, Prosperville, Oroland subd, One Communities. NGO Village, Zone 6, Zone 8, zone 10, Villasor, Phase 6-A & B, Prk San Roque, Prk Kawayanan, Monico Ville. SM Hypermarket.

SF2 From Sum-ag Substation along Abuanan Road (Sum-ag) to portion of Bago, Brgy. Tabunan, Brgy. Dulao, Brgy. Atipuluhan, and Brgy. Abuanan, Sayson Piggery, Quiet Place Resort, GC&C Crusher, Prk. Sambag, Prk. Cadena de Amor, Prk. Rose 1 & 2, Prk. Maasin & Prk. Sta. Rita, Prk. Theodora Brgy. Damsite, Prk. Tumpok & Prk. Overflow, Blumentritt.

Hilangban (Bago) Substation
HF1 Portion of Brgy Lag-asan, Brgy. Balingasag, Bago City College, Prk. Kapahuan 1 & 2, Bago City Hospital, Prk. Santan, San Esteban Phase 2, Sta. Catalina Subdivision, Brgy. Sampinit, CF1, CF2, San Gabriel Subd., Villa Cristita, Carmella Homes, Prk. Camingawan, Prk. San Francisco, BrgyCalumanggan, Prk. Flower, Prk. Paraiso, Brgy. Taloc, Prk, Newton, Cawayanan.

HF2 The wholearea of Bago City including San Esteban Phase 1, Brgy. Poblacion, Pta. Playa, Prk. Batad, Prk. Malipayon, Baywalk.
HF3 Crossing Ubay, Bago Eco-Center,Humberto’s Resort, Hda. Pili, Brgy. Pacol, Brgy. Bagroy, Brgy. Sagasa, Brgy. Caridad, Brgy. Allanza, Brgy. Don Jorge Araneta (Central Ma-ao)

HF4 Lag-asan relocation site, Brgy. Napoles, Brgy. Malingin, Crossing Mining, Brgy. Ma-ao, Villa Cresteta, Brgy. Bacong, Brgy. Binobuhan, Brgy. Mailum, Brgy. Ilijan, Viva Mineral Water, Buenos Aires Resort, Brgy. Manghumay, PNOC-EDC

Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102 and 1103 or at mobile numbers 0949-401-0144 and 0967-471-5122.

 

Sorry for the inconvenience.

 

(SGD.) ATTY. ARNEL L. LAPORE
Acting General Manager